Date Project Registered Project Number Proponent Description of the Project Location (county) Assigned Project Manager Status Date of Decision
2022/01/13
1574 628643 N.B. Inc.
The proposed project involves a 62 lot expansion of the Red Oak Subdivision, an existing single-family residential development in the Irishtown area. Westmorland Justin Chase Determination review in progress  
2022/02/16 1575 Prote’insect Ltd.
The proposed project involves the implementation of an insect (mealworm) farm to produce protein. The farm will be located within an existing building in Dalhousie. 
Restigouche Pierre Doucet Certificate of determination issued 2022/06/01
2022/02/23 1576 Theriault & Hachey Peat Moss Ltd.
Development of Peatland No. 6 located in the Local Service District of Gleneg in the county of Northumberland
Northumberland Patrick Mbaya Determination review in progress  
2022/03/18 1578 Irving Pulp and Paper The Project involves the construction of a new environmental treatment facility and water use reduction system. Saint John Patrick Mbaya Certificate of determination issued
2022/07/19
2022/04/04 1579 643562 NB Inc. operating as Riverside Resort and Conference Centre
The proposed project involves the development of a potable groundwater source at the Riverside Resort and Conference Centre located in French Village. 
York Pierre Doucet Determination review in progress  
2022/04/08 1580 705052 NB Inc. – Residential Complex
The proposed project involves a new 18-unit apartment building with a new private well in the Village of Cap-Pelé. The EIA Registration also includes up to three potential future apartment buildings.
Westmorland Justin Chase Determination review in progress  
2022/04/13 1581 Alyssa Savoie Construction of a residential property with erosion control features in wetland greater than 2ha Northumberland Patrick Mbaya Determination review in progress  
2022/04/29 1577 Northwest Regional Service Commission (NWRSC) The Northwest Regional Service Commission (NWRSC) proposes to increase the height to which waste is deposited in the currently active, and all future, waste containment cells of the NWRSC sanitary landfill at 248 Chem. Clément Roy, in Rivière-Verte, New Brunswick Madawaswka Patrick Mbaya Determination review in progress  
2022/05/03 1582 Department of Tourism, Heritage and Culture
The current undertaking includes the proposed dredging of the inlet, lagoons and channel to facilitate regular tidal flushing and prevent flooding of the adjacent parking lots. Westmorland Brandon Love Determination review in progress  
2022/05/18 1583 Kelly Cove Salmon Ltd
The proposed project involves a new land-based Atlantic salmon post-smolt aquaculture facility located in Bayside. The water supply for the facility was registered as a separate project (EIA Registration number 4561-3-1481).
Charlotte Justin Chase Determination review in progress  
2022/05/18 1584 KV Custom Homes Inc
The proposed project involves the construction of a residential development off Pettingill Road in Quispamsis. The first phase would consist of 14 two-bedroom units, with a potential of 44 units in total.
York Pierre Doucet Determination review in progress  
2022/05/18 1585 Crabbe Mountain Investments Inc.
The proponent (Crabbe Mountain Investments Inc.) proposes to upgrade the on-site septic disposal system which services the main lodge at the Crabbe Mountain Ski Resort that is located in Central Hainesville, New Brunswick. York Shawn Hamilton Certificate of determination issued
2022/07/15
2022/05/24 1588 Sun Gro Horticulture Canada Ltd.
The proposed project involves a modification to an existing peat development approved previously through an EIA review (registration #4561-3-1283; Peatland 343, “Oak Point”). The modification involves a new access road and service area already built in 2021, as well as an expansion of peat harvesting into private parcels recently acquired.    
Northumberland Justin Chase Determination review in progress  
2022/06/20 1589 T.A. Raymond Environmental Services Ltd. – Hylyne Estates
The proposed project involves a 49-lot expansion to an existing residential development off Robertson Road, outside of Hampton. 
Kings Justin Chase Determination review in progress     
2022/06/21
1586

Brideau Robichaud Enterprises Inc.

Supplementary Documents

The project involves the installation of an irrigation system fed by groundwater wells for existing blueberry fields in the Petite Rivière Tracadie Sud area.
Gloucester
Pierre Doucet
Determination review in progress
 
2022/06/21
1587
661217 N.‐B. inc.
The project involves the installation of an irrigation system fed by groundwater wells for existing blueberry fields in Brantville
  Pierre Doucet
Determination review in progress
 
2022/06/21 1591 Ocean Surf RV Park
The current undertaking proposes to construct one new potable water well on their Ocean Surf RV Park property in Shediac.
 Westmorland Brandon Love Determination review in progress  
2022/06/29 1590 J.D. Irving Limited
The proponent (J.D. Irving, Limited) proposes to upgrade the on-site septic disposal system which services the J.D. Irving Deersdale Sawmill, Deersdale, New Brunswick. York Shawn Hamilton Determination review in progress  
2022/06/30 1593 City of Edmundston
The proposed project consists of drilling a new pumping well immediately adjacent to the existing Jos-Soucy well, and connecting to the existing pumphouse and buried pipeline, which pumps the water to waste in the nearby Mastic Brook, a tributary of the Saint John River. Madawaska Brandon Love
Determination review in progress
 
2022/07/05 1592 NB Power The proponent (NB Power) is proposing to upgrade the existing transmission line L0073 to increase its capacity from 69 kV to 138 kV. The upgraded L0073 will be renamed L1249. The Project is situated entirely within the Town of Grand Falls, New Brunswick
Victoria Shawn Hamilton Determination review in progress  
2022/07/12 1594 CCM Towing and Recovery Inc. The current undertaking includes the development of a 5-lot subdivision where each lot will be serviced by a well and septic system.  Charlotte Shawn Hamilton Determination review in progress  
2022/07/13 1595 His Tabernacle Family Church The proposed project involves construction of a church building, septic system, roadway, and parking lot within a wetland in Garnett Settlement. 
Saint John Justin Chase Determination review in progress  
2022/07/26 1596 ORLEN Upstream Canada Ltd.
The proposed project involves Decommissioning of 44 oil and gas wells in the Stoney Creek Wellfield and ancillary locations, outside of Hillsborough and Salisbury. 
Westmorland/Albert Justin Chase Determination review in progress  
2022/07/29 1570 New Brunswick Department of Transportation and Infrastructure (NBDTI)
NBDTI is proposing to reconstruct the bridge with a new, multiple-span steel and concrete structure. The new structure will be part of the regional multi-use trail system contributing to local tourism (Véloroute de la Péninsule acadienne), will provide navigation for watercraft on the river, and a safe crossing for users. Gloucester Patrick Mbaya Determination review in progress