Government of New Brunswick
  • Description
  • Contacts
  • Overview

    Plan reviews are required for plumbing installations having more than thirty (30) fixtures.

    Eligibility

    Plumbing Contractors are required to submit three copies of the plumbing plans to the Chief Plumbing Inspector.

    Description

    Plumbing plans must show, in detail, the location and size of every building drain, trap, cleanout, fitting, soil-or-waste pipe, vent pipe and layout of potable water distribution system, including pipe sizes and valves.

    Plumbing plans should reflect the means and devices which will be used to address cross connections with potable water supplies. The plans should also meet the fire safety and fire stopping requirements of the National Building Code of Canada.

    No fees associated with submission of a Plumbing Plan Approval.

    Contact Email Location
    Bathurst
    Campbellton
    Edmundston
    Fredericton
    Miramichi
    Moncton
    Saint John
    Woodstock