Date Project Registered | Project Number | Proponent | Description of the Project | Location (county) | EIA Specialist | Status | Date of Decision |
---|---|---|---|---|---|---|---|
2025/01/06 | 1642 | NB Power | NB Power is proposing approximately 265 km of Transmission Line between NB and NS to be developed in two phases. This project is for Phase 1, consisting of 65 km of new 345 kV transmission line in southeastern NB, in a corridor up to 50m wide parallelling existing lines (#3006 and #3025) between Salisbury and Memramcook, then to the NB/NS border near Point de Bute. Existing terminals in Salisbury and Memramcook will also be expanded and upgraded to accommodate new infrastructure. |
Albert / Westmorland | Duane Mercer | Determination review in progress | |
2025/02/24 | 1643 | Astuwicuwon Inc | The Astuwicuwon Wind Project will consist of up to 22 wind turbine generators, a new substation, new collector lines, and an overhead transmission line required to connect the Project to the existing NB Power electrical grid. | Carleton | Brandon Love | Determination review in progress | |
2025/03/20 | 1644 | Berger Peat Moss Ltd. | Berger Peat Moss Ltd proposes an 8.6 hectare expansion of lease 11 on bog 324W | Northumberland | Pierre Chiasson | Determination review in progress | |
2025/03/10 | 1645 | Papoqji’jg Wind Inc. | The Papoqji’jg Wind Project will consist of up to nine wind turbines capable of producing up to 63 megawatts of renewable energy, a substation as well as a series of collector and transmission lines to connect power to the existing grid. This project will be located on Crown Lands approximately 40 km west of Bathurst. | Restigouche / Northumberland | Patricia Holland | Determination review in progress |