Government of New Brunswick
Date Project Registered Project Number Proponent Description of the Project Location (county) EIA Specialist Status Date of Decision
2016/01/05 1425 Rural Community of Kedgwick   The purpose of the project is to provide the rural community of Kedgwick with an additional water resource in order to meet its daily requirements   Restigouche   Crystale Harty   Cancelled    
2016/01/18 1426 Village of Memramcook 2016 Groundwater Exploration (Pump Test) Program – The proponent is proposing to conduct pumping tests on existing test holes located on Village property with the goal of developing a backup well for the municipal drinking water system. Westmorland Pierre Doucet Certificate of Determination Issued  
2022/08/10
2016/02/15 1427 The Department of Fisheries and Oceans – Small Craft Harbours (DFO-SCH) The proposed harbor improvement project consists of the construction of a new breakwater, a service/parking area, concrete boat ramp, and dredging of the New Mills harbor basin. Restigouche Crystale Harty Certificate of Determination Issued   2016/07/31
2016/02/16 1428 Omera Shells Inc. Transportation of waste shells from out of province – The proponent is proposing to import crustacean shells from other Atlantic provinces and Québec in order to process them for export, mainly in Asia. Kent Pierre Doucet Certificate of Determination Issued   2016/07/06
2016/03/24 1429 Kingsclear First Nation The project consists of upgrading the existing wastewater treatment plant in order to improve effluent quality. The project will be located in Kingsclear, NB York Crystale Harty Certificate of Determination Issued
2016/10/21
2016/04/06 1430 Capreit Apartments Inc. River East Estates New Production Well – The proponent is proposing to drill a new groundwater production well to supply drinking water to the 109-lot residential subdivision located in Riverview Albert Pierre Doucet Certificate of Determination Issued 2017/01/16
2016/04/11 1431 Doaktown Sawmill and Value Added Centre, Div. of J.D.Irving Limited The proposed project includes the demolition of existing sawmill building and constructing a new, modern sawmill building on the same site. The project will take place at 120 South Road, Doaktown, NB, adjacent to the Miramichi River.  Northumberland Shawn Hamilton Certificate of Determination Issued   2016/07/28  
2016/05/02 1432 Potash Corporation of Saskatchewan Inc. (Potast Corp. NB Division) The proposed project involves the decommissioning of the Penobsquis Potash Mine located in Penobsquis, NB.   Kings Shawn Hamilton Certificate of Determination Issued   2017/01/11
2016/05/12 1433 Irving Pulp & Paper (IPP), Limited The proposed project involves the construction of a new pulp dryer and associated equipment at the Irving Pulp & Paper Mill in Saint John, NB. Saint John Shawn Hamilton Certificate of Determination Issued 
2016/09/30
2016/06/02 1434 Town of Oromocto The proposed project involves the construction of a new drinking water treatment plant. Sunbury Shawn Hamilton Awaiting additional information
 
2016/06/02 1435 Town of Oromocto The proposed project involves the construction of a new wastewater treatment plant. Sunbury Shawn Hamilton Awaiting additional information
 
2016/06/22 1436 HSF Foods Ltd. This project involves the construction and operation of three new production wells at the HSF Foods Ltd. facility located at 741 Central Street in Centreville, NB. Carleton Stephanie Symons Awaiting additional information
 
2016/06/28 1437 Reel Shrimp Inc. The development of a land-based. Intensive recirculating enclosed facility, for the production of White Pacific Shrimp in Blacks Harbour, NB Charlotte Cassandra Colwell Certificate of Determination Issued 2016/10/14
2016/07/07 1438 Shediac Camping Resort. The proposed project involves the development of a 220 lot campground which is located along Route 133 in Beaubassin Est. Westmorland Shawn Hamilton
On Hold
 
2016/07/20 1439 Stewart Vertical Farms Inc. The project consists of the development of an aquaponics operation that will produce 200 metric tonnes of Tilapia fish and 1000 metric tonnes of plant produce per year in full production. The operation is being proposed in St. Stephen, NB. Charlotte Crystale Harty Certificate of Determination Issued 2016/10/31
2016/07/25 1440 The Department of Fisheries and Oceans – Small Craft Harbours (DFO-SCH) The proposed harbour improvement project consists of the construction of a new service area, rock protection, an access road, and dredging of the Petit-Rocher small craft harbour basin Gloucester Crystale Harty Certificate of Determination Issued 2017/01/31
2016/08/02 1441 New Brunswick Department of Tourism Heritage and Culture New on-site effluent disposal system, Mactaquac Provincial Park – The proponent is proposing to decommission an existing mechanical wastewater treatment plant and replace it with a contour trench septic system. York Crystale Harty Certificate of Determination Issued 2016/10/28
2016/09/07 1442 Victor Bernard & Sons Limited Wastewater Treatment System Improvement – The proponent is proposing to add an aeration system to an existing lagoon at their facility located in Charlo. Restigouche Pierre Doucet Certificate of Determination Issued 2019/06/19
2016/09/07 1443 CG GROUP LTD The proponent proposes to replace the closed Seagull Motel and restaurant located in Shediac Bridge with a 33 unit condominium building including private well and wastewater treatment system. Westmorland Lee Swanson

Certificate of Determination Issued

2017/05/17
2016/09/09 1444 New Brunswick Department of Tourism, Heritage and Culture Construction and development of a snowmobile refuelling station and a two-bay drive-through groomer maintenance shed, refurbishment of approximately 50 kilometers of existing snowmobile trails on existing Park roads, installation of new signage, and vegetation clearing/widening of existing trails to increase visibility in Mount Carleton Provincial Park. Restigouche and Northumberland Sheila Goucher Certificate of Determination Issued
2019/05/30
2016/09/12 1445 The Department of Fisheries and Oceans – Small Craft Harbours (DFO-SCH) Dredging and placement of approximately 15,000 cubic meters of material within Le Goulet harbour in front of Burns Island for the purpose of creating/expanding wetland habitat. Gloucester Crystale Harty Certificate of Determination Issued 2017/11/10
2016/09/15 1446 Lake Utopia Paper, a division of J.D. Irving, Limited Effluent Treatment Upgrade – The proponent is proposing to install new equipment in order to upgrade the effluent treatment system at its existing mill located in Utopia. Charlotte Sheila Goucher Certificate of Determination Issued 2016/12/16
2016/09/28 1447 City of Miramichi Chatham Wellfield TH3-2016 Groundwater Exploration – The proponent is proposing to conduct groundwater exploration in the Chatham area in the hopes of developing a new municipal groundwater well. This project is considered distinct from the similar project currently under EIA review (file # 1420) Northumberland Pierre Doucet Cancelled
 
2016/10/03 1448 N C H Developers Inc Wilsey Heights, Wilsey Woods Subdivision and Meadow Lands Subdivision – The proponent is proposing to develop a total of 309 lots split between three residential subdivisions on Wilsey Road in Rusagonis. York
Pierre Doucet Certificate of Determination Issued
2022/07/19
2016/10/19 1449 Saint John Airport
Wastewater Treatment Plant Upgrades – The proponent is proposing to replace its existing rotating biological contactor (RBC) and chlorination system with a new sequencing batch reactor (SBR) and UV disinfection. Saint John Pierre Doucet Certificate of Determination Issued 2017/02/21
2016/11/25 1450 Horizon Management Ltd.
The proposed project involves the development of a mixed-use commercial and residential development “The Crossing”, on 49 hectares of land within the City of Saint John. Saint John
Lee Swanson
Awaiting additional information
 
2016/12/02 1451 McCain Foods (Canada) Ltd. Water Supply Source Assessment (WSSA) at the McCains Florenceville-Bristol Facility to identify a potential groundwater source capable of supplementing the anticipated increase in water demand for the facility. Carleton Lee Swanson On hold
 
2016/12/22 1452 Les Tourbières Berger Ltée The proposed project involves the expansion of the peat harvesting operation for Bog 324W which is located in both Northumberland and Kent counties.. Northumberland and Kent   Lee Swanson Certificate of Determination Issued
2018/07/13