Government of New Brunswick


An approved plan review is required for all new installations and alterations of an elevating device.


Three copies of drawings and specifications, stamped and endorsed by a registered professional engineer, must be submitted to the Chief Inspector and must provide complete information on the size, composition and arrangement of the proposed new or altered installation.


Any person installing or altering an elevating device must have plans approved by the Chief Inspector.


Unless otherwise specified, Fees exclude the harmonized sales tax (HST).

Fee DescriptionRate in $Effective Date
The fee for plan approval is included in the cost of an installation permit0.00