Date Project Registered | Project Number | Proponent | Description of the Project | Location (county) | EIA Specialist | Status | Date of Decision |
---|---|---|---|---|---|---|---|
2018/01/12 | 1489 | New Brunswick Power Corporation (NB Power | The proposed project consists of the construction and operation of a new substation and new transmission line (Phase 1), and the decommissioning of an existing substation and two existing transmission lines (Phase 2) near Neguac, NB. | Northumberland & Gloucester | Justin Chase | Certificate of Determination Issued |
2018/07/23 |
2018/01/22 | 1490 | NB Power Corporation | The proponent proposes to install and operate two new submarine electrical transmission cables to Fundy Isles (Deer Island, Campobello Island and Grand Manan) from mainland New Brunswick. | Charlotte | Sheila Goucher | Certificate of Determination Issued |
2018/09/20 |
2018/02/23 | 1491 | Village de Le Goulet | The project consists of the restoration of sand on the Village of Le Goulet’s dune system as a climate change adaptation measure. | Gloucester | Pierre Doucet | Certificate of Determination Issued | 2018/03/16 |
2018/02/28 | 1492 | Pecheries Ste-Cecile Inc. | The proponent is proposing to expand the existing M&N Seafood Plant in Sainte-Cécile (which will continue to process herring roe) with the addition of a separate building that will house a lobster and crab processing line. | Gloucester |
Pierre Doucet | Certificate of Determination Issued |
2018/10/09 |
2018/04/16 | 1493 | DFO-SCH | The project consists of the dredging of Shippagan Gully and the construction of a 200 meter long breakwater. | Gloucester | Duane Mercer | Certificate of Determination Issued |
2019/09/06 |
2018/04/16 | 1494 | Wisokolamson Energy LP | The proposed project involves the construction of five wind turbine generators with a capacity of 18 Mega Watts and a new substation. The proposed project is located on crown land and private lands south of New Ireland Road. | Albert | Pierre Doucet |
Certificate of Determination Issued |
2018/09/21 |
2018/06/25 | 1495 | Sagewill Enterprises Ltd. | The proposed project involves the development of a limestone quarry north of Hammond River near the community of French Village. |
Kings | Pierre Doucet | Awaiting additional information | |
2018/06/27 | 1496 | The Village of Fredericton Junction Amendment |
The Village is proposing to undertake a ground water exploration program to find an alternate source of drinking water |
Sunbury | Sheila Goucher | Certificate of Determination Issued |
2020/09/30 |
2018/07/10 | 1497 | The Department of Transportation and Infrastructure |
The proponent proposes to remove the Northwest Miramichi River No. 1 (Anderson) Bridge along Route 8 and fully replace it with a new bridge slightly upstream. | Northumberland | Pierre Doucet | Certificate of Determination Issued |
2020/05/06 |
2018/09/18 |
1498 | Trevali Mining (New Brunswick) Ltd. Supplemental Technical Data Report |
Trevali is proposing to construct a new tailings management facility (TMF) at the Caribou mine in 2 stages. Stage 1 – would provide additional tailings storage capacity for the current life of mine. This stage would include a new tailings dam, emergency spillway, TMF basin, polishing pond and dam as well as a water treatment facility; Stage 2 – would consist of raising the Stage 1 dam which would inundate portions of the mine in support of mine closure and potentially provide additional tailings storage capacity should the mill continue to process ore from satellite operations. This stage would involve a tailings dam raise, expanded emergency spillway and tailings basin. An alternative access road to the mine site would also be built. |
Restigouche |
Sheila Goucher | Inactive | |
2018/08/10 | 1499 | The Department of Fisheries and Oceans – Small Craft Harbours (DFO-SCH) |
The proposed project consists of the construction of a new containment cell for the New Mills Harbour. |
Resticouche | Cassandra Colwell | Certificate of Determination Issued |
2018/12/21 |
2018/08/17 | 1500 | Tourbières L.M. Ltée | The proponent is proposing to harvest peat by developing Bog # 564, near Saint-Léolin, which will include the construction of an access road, sedimentation ponds, and drainage channels. | Gloucester | Pierre Doucet | Certificate of Determination Issued |
2019/12/02 |
2018/09/13 |
1501 |
The Village of Grand Manan |
The Village is proposing to construct and operate an Aquatic Centre and Wellness Facility consisting of a 5-lane lap pool, a children’s pool with a slide, a spectator area, walking track, ancillary support area, and revenue spaces. |
Charlotte |
Sheila Goucher | Determination review in progress | |
2018/09/10 |
1502 | Fisheries and Oceans Canada - Small Craft Harbours | The proponent is proposing to decommission three wharfs on Campobello Island and Deer Island in the locations of Curry Cove, Chocolate Cove, and Richardson Wharf. |
Charlotte | Cassandra Colwell | Certificate of Determination Issued |
2019/02/14 |
2018/09/12 | 1503 | Fisheries and Oceans - Small Craft Harbours (DFO-SCH) | The proposed project consists of expanding the existing containment cell at the Pointe-Sapin Harbour and dredging the harbour basin. |
Kent | Rachelle Voisine | Certificate of Determination Issued |
2018/02/2 |
2018/09/17 |
1504 |
The Department of Transportation and Infrastructure |
The proponent proposes to decommission the existing sewage treatment lagoon at Harvey High School |
York | Rachelle Voisine | Certificate of Determination Issued |
2019/01/31 |
2018/09/13 |
1505 |
Fisheries and Oceans Canada - Small Craft Harbours (DFO-SCH) |
The project consists of decommissioning a derelict small craft harbour facility. The work will involve removal of the end of an existing wharf and covering the remainder with rock to stabilize it and create a breakwater. |
Charlotte |
Sheila Goucher |
Certificate of Determination Issued |
2018/12/07 |
2018/09/20 | 1506 | Wocawson Energy Project |
The proposed project involves the construction of 6 to 12 wind turbine generators with a capacity of 20 to 40 Mega Watts, a new substation and a new transmission line. The proposed project is located on crown land 20 km northeast of Sussex, New Brunswick. |
Kings | Pierre Doucet | Certificate of Determination Issued |
2019/03/12 |
2018/10/29 | 1507 | Repairs to Retaining Wall At 11 Southers Road (Bayswater) Adjacent to Wetland |
The proposed project involves the construction of a new retaining wall within a regulated wetland to support an existing retaining wall which has become eroded. |
Kings | Cassandra Colwell | Certificate of Determination Issued |
2018/12/06 |
2018/11/02 | 1508 | Hammond River Holdings Limited |
The proposed project involves the development of an open pit quarry for the extraction of gypsum. |
Kings | Patricia Holland | Certificate of Determination Issued |
2019/10/15 |
2018/11/20 | 1509 | Fisheries and Oceans Canada - Small Craft Harbours (DFO-SCH) |
The proponent proposes to construct a new containment cell, conduct other associated alterations, install a new floating wharf and dredge the harbour basin at the Anse-Bleue harbour | Gloucester | Rachelle Voisine | Certificate of Determination Issued |
2019/06/12 |
2018/11/23 | 1510 | Berthe Comeau | The proponent is proposing to expand their existing campground « Chalet & Camping de la Pointe » of 178 sites by adding eleven new sites with services, using an existing well and installing a sewage system |
Gloucester | Cassandra Colwell | Certificate of Determination Issued |
2019/08/28 |
2018/12/03 | 1511 | Villa Sormany |
The proponent is proposing to develop a new potable water well for the Villa Sormany nursing home in Robertville. |
Gloucester | Pierre Doucet | Certificate of Determination Issued |
2019/05/30 |
2018/12/18 | 1512 | Domaine Nature Estates Subdivision |
The proponent is proposing to continue development of the existing subdivision, consisting of 88 lots. The proposed expansion will add an additional 80 lots and associated infrastructure |
Westmorland | Shawn Hamilton | Certificate of Determination Issued |
2020/02/07 |
2018/12/19 | 1513 | At Landing |
The proponent proposes to expand their existing facility in Blacks Harbour by adding a sea cucumber cutting and blanching process |
Charlotte | Jillian Craig | Certificate of Determination Issued |
2021/06/07 |
2018/12/21 | 1514 | Kelly Cove Salmon Ltd. |
The proponent proposes to expand the Johnson Lake Hatchery and upgrade the waste treatment system |
Charlotte | Rachelle Voisine | Certificate of Determination Issued |
2019/07/05 |